Impact Crusher, Impact Crusher 1315, Horizontal Shaft Impact Crusher manufacturer / supplier in China, offering 2021 High Efficiency Horizontal Shaft Impact Crusher 1315 in USA, Copper Ore and Gold Ore Flotation Machine Separation Foam Flotation, > 99% Recovery Gold Copper Flotation Separator Equipment and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Piece | US $15000.00/ Piece |
Local Area: | Zhengzhou, Henan, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Type: | Gravity Separator |
---|---|
Voltage: | 220V |
Weight: | 1T |
Product Description
Describe:
Hydrocyclone is a classifier which utilize centrifugal force to accelerate ore particle deposition. Due to the lack of moving, power parts, the need for the corresponding mud pump.It is mostly used in the second closed circuit grinding.
Fluid cyclone is a kind of common separation and classification equipment. When the two-phase mixture to be separated enters the cyclone tangentially from the periphery of the cyclone at a certain pressure, a strong three-dimensional elliptical strong rotational shear turbulent motion is generated. Due to the difference in particle size between coarse particles and fine particles, they are subjected to different sizes of centrifugal force, centripetal buoyancy and fluid traction force, etc. Due to the action of centrifugal sedimentation, most of the coarse particles are discharged through the bottom orifice of the cyclone, while most of the fine particles are discharged through the overflow pipe, so as to achieve the purpose of separation and classification.
Class type; One stage graded cyclone, two stage graded cyclone
1. Before starting the test run, make sure that all connection points of the cyclone unit have been tightened, and remove all kinds of residues in the pipeline and the cabinet of the unit, so as to avoid leakage and blockage after starting. Be sure to fully open the operating cyclone valve. College
2. The valve may be fully open (e.g., running cyclone) or fully closed (e.g., standby cyclone), but must not be half-open (i.e., never use the valve to control flow). College
3. If possible, test run with fresh water first. The feeding of the cyclone may be provided by pumping or by means of a high slot. If the pump and the cyclone throughput match, the pressure gauge shows a constant reading. Make sure the gauge reading does not fluctuate, and if there is a significant fluctuation, check the cause. The equipment is required to operate under a pressure not higher than 0.3MPa. College
4. When the equipment is running smoothly under normal pressure, check the leakage of connection points and take remedial measures if necessary. College 5. Check for any blockage caused by residue entering the cyclone. If the inlet of cyclone is blocked, the overflow and sand settling flow rate will be reduced. If the inlet of cyclone is blocked, the sand settling flow rate will be reduced or even cut off. Sometimes, severe vibration will occur. In case of blockage, close the feeding valve of the cyclone in time to clear the blockage. In order to prevent the blockage, the feeding pool of the hydrocyclone group can be equipped with facilities to prevent coarse materials and sundries (such as anti-dandruff screen). Meanwhile, the feeding pool should be emptied in time when parking, so as to avoid the blocking accident caused by excessive precipitation and concentration when driving again. College 6. When the equipment is proved to be in good operation by the clean water test, the slurry can be fed into it for operation.
Advantage:
Note:
Mainly reflected in the above five types of operations. Hydrocyclones have been widely used in the processing technology of various metal mines.
According to the requirements of grinding capacity, fineness of overflow and concentration of sand deposition, it is the precondition to select the proper size and type of cyclone to reach the optimum working condition. We can provide users with φ100, φ125, φ150, φ200, φ250, φ300, φ350, φ500, φ660 and other single, parallel or series units.
Product Parameters
Model
Diameter
(mm)
Inclination
(°)
Maximum feed size
(mm)
Feed pressure
(Mpa)
Capacity
(m³/h)
Separation size
(mm)
Dimensions
(mm)
FX-100
10081
0.05-0.45-1210-74257x210x829
1510-100257x210x575
2020-100250x210x525FX-125
12581
0.05-0.48-15
20-74
210x240x973
1720-100
280x185x617
FX-150
1508
1.50.05-0.411-2020-74
290x295x1267
15
30-74
252x349x899
20
30-74
320x270x682
FX-200
200152
0.05-0.425-4030-100320x307x1114
2040-100548x307x1025
FX-250
250103
0.05-0.440-6530-100548x415x1380
1540-100548x390x1057
2040-100563x534x1178
FX-300
300155
0.03-0.445-9040-100563x410x1490
2050-150530x410x1304
FX-350
350156
0.03-0.460-10550-120
530x413x1674
2050-150530x413x1411
2550-150530x413x1411
FX-500
50010100.03-0.4140-22074-150 951x718x22802074-200850x623x18252574-200951x718x1825FX-660
6602016
0.03-0.4250-36074-2001215x850x2720
Detailed Photos
Packaging & Shipping
Standard containers, bare main machine, motors and small parts are packed in wooden cases.
Delivery port:
Within 45 days Qingdao,Shanghai,Tianjin and other ports.
Company Profile
Henan Xingyang Mining Machinery Manufactory (in the past is local state-owned enterprises ),the company located in the western of Zhengzhou city,Henan province.
Our company was founded in 1956,subsidiary company have Henan Xingyang Mining Machinery CO., LTD, Tibet Branch, Xinxiang casting plant, Xinxiang processing factory.
After Sales Service
-Pre-sale services
based on the clients' request and budget, we will offer equipment pictures, working site videos, plant processing diagram, assemble drawings, foundation drawings, and plant layout. Clients are welcome to visit our factory, also our equipment working site from former clients. We will arrange cars, hotels and translators for the visiting customers.
-Sale services
Our experienced technicians is available on the phone also the internet, clients can get instance guidance by telephone, email, online service anytime, anywhere. As clients' request, we will send technician to the mine site to guide the installation, trial run test, and training operators until the plant works normally.
-after-sale service.
Equipment spares will be offered with manufacturing cost in at least 10 years since the order is placed. To establish long term cooperation, we will regularly call and email our clients, to check the equipment working condition, offer suggestions for maintenance, and if necessary we will pay a visit to clients to solve the problems caused during equipment working.