Outboard Motor Propeller, 2 Stroke 15HP Propeller, Outboard Spare Parts manufacturer / supplier in China, offering Calon Gloria Marine Application Fish Boat Propeller for Outboard Motor, Calon Lower Price Plastic Fuel Tank Used for Outboard Motor, Calon Gloria 15HP Boat Engine Two Stroke High Quality Gasoline Manual Start 246cc 11kw Outboard Motor and so on.
Min. Order / Reference FOB Price | |
---|---|
5 Piece | US $590.00/ Piece |
Local Area: | Hangzhou, Zhejiang, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Material: | Aluminum |
---|---|
Blades: | 3 |
Certification: | ISO9001:2000 |
> Overspeed protection
If the machine is running, the engine speed exceeds the specified speed value, the machine speed limit protection device will automatically
limit the speed, to prevent engine overheating caused by engine damage
> Low oil pressure warning
When the oil pressure drops below the specified pressure, the engine speed drops automatically
> Overheating protection
If the inlet is blocked, the machine is hot. The cylinder head is equipped with a temperature-controlled sensor. If the temperature is too high,
the automatic speed limit will not work properly and the machine will not be damaged.
> Carburetor improvement
Anti corrosion for carburetor, and improvement on the idle jet to main jet, engines will be more stable.
>5 layers paint
5 layers paint for anti corrosion, with electrophoretic coating ensuring the best protection.
> Anti-noise system
New improvement on the anti-noise systemElectrical Control System for exhaust control, it's a quiet engine
> New design for exhaust system
More preciously temperature control with the new design on exhaust radiator.
> Upgraded oil piper
Anti-aging upgraded oil piper, pressure test over 0/4kg,tensile strength over 8MPA and the elongation at break is over 200%
> Automatic positioning system
Automatic positioning system tilt through the elastic locker, much easier for operation> Hour metering
New added the hour metering, ensure the right time for maintenance.ALL THE MOTOR PARTS ARE AVAILABLE FOR SALE!
1. OEM Manufacturing welcome: Product, Package...
2. We will reply you for your inquiry in 24 hours.
3. After sending, we will track the products for you once every two days, until you get the products. When you gLED Video Processor ot
thegoods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we
will offerthe solve way for you.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral foam boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.Q2. What is your terms of payment?
A:We accept T/T, WESTERN UNIOn, PAYPAL, MonEY GRAM, L/C, etc..Q3. What is your terms of delivery?
A: EXW, Lean Pipe & Pipe Rack System FOB, CFR, CIF, etc.Q4.Gift Box & Bag How about your delivery time?
A: Generally, it will take 7-21 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.Q5. Do you test all your goods before delivery?
A: Yes, we have 100% test before deliveryQ6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.